""

Search This Blog

Showing posts with label 5 stage plan. Show all posts
Showing posts with label 5 stage plan. Show all posts

Saturday, February 13, 2016

MOhemp Hazmat 5 Stage Treatment Train



Here is how MOhemp Hazmat 5 stage Phytoremediation process fits another scenario in the Treatment Train to remove the heavy metal toxins from the soil at St Louis Hazmat Sites.

This snippet of information from 
Phytoremediation for bioenergy: challenges and opportunities S.Gomes
Helena I. Gomes (2012) Phytoremediation for bioenergy: challenges and opportunities
Helena I. Gomes (2012) Phytoremediation for bioenergy: challenges and opportunities
 MOhemp Hazmat 5 stage process not only addresses the opportunities and threats.  It speeds up the phytoextraction process of Heavy Metals Toxic Removal.

Stage 1: Riparian Buffer
Stage 2: Organic Micro Fungi Stimulation and Habitat Creation
Stage 3: Solar Powered Electro-Horticulture 
Stage 4: Organic Tea Root Stimulation and Dust Control
Stage 5: Phytoremediation by Phytoextraction

All of which will provide a greater biomass resources that will offset the financial costs to implement the MOhemp Hazmat 5 Stage Phytoremediation green remediation treatment strategy.





Share This

Organization and Social Sites