Scottys Hempcrete Post Frame Building is the Perfect Solution to meet and exceed every need of the Energy Efficient and Sustainable Housing crisis that is plaguing America and beyond.
If someone else has put 2 and 2 together on this perfect match for building Energy Efficient Sustainable Building using sustainable hempcrete; I've yet to read it about online or from any of the many progressive builders I follow who are constructing and working on energy efficient buildings. I consider myself a trendsetter in this type of construction technique.
This isn't the first time I've shared this design build construction technique and it will not be the last. This is also the design that I will re-submit to NREL, Oak Ridge Laboratories, and DOE for upcoming contests for Energy Efficient Building Design.
With this blog post I will demonstrate how the Post Frame Building Principles: saves money, saves energy, and saves resources.
Residential Post Frame Examples- The economical revamped old style of pole barn construction for modern day uses
In the above Post Frame Residential Building Photos notice the exterior of the buildings can incorporate any of the aesthetic designs your heart desires- Siding, Brick, Stone, Stucco, or Wood.
Here's How Post-Frame Buildings Can Save on Construction Costs
Fewer Materials Needed for Construction
Post-frame construction requires limited wall and roof framing materials, and minimal footing and foundation materials. Wood posts spaced 8 to 12 feet apart with a frame building system means fewer resources than most other construction methods.
| Reduction of Labor Costs
Post-frame construction site preparation often requires fewer trades and less time. Fewer building components lead to less time for installation labor then those built with wood frame systems. This is because many post-frame building components come prefabricated to the project site.
|
Shorter Time of Construction
Start with a wood frame system site preparation. Post-frame construction utilizes posts to build frames. Augering holes for posts require minimal effort. On average, it takes experienced post-frame contractors two or three days to erect a basic frame. That includes posts, girts, trusses, and purlins.
| Minimization of Construction Delays
Delays due to cold weather, even in northerly climates, are minimal. With frame building systems, post foundations can be installed on or below freezing temperatures.
|
Versatility Achieve virtually any aesthetic with post-frame construction’s flexibility and large, open interiors. | Sustainability Post-frame construction includes various sustainable benefits. Many of which can help earn LEED Certification. |
Savings start
in the Framing Design and Construction. Notice in the following examples how the top image uses less lumber in the construction of the buildings structural assembly.
Compare the Lumber Needs of Post Frame Building to Traditional Building Techniques image below Example of Traditional Stick Frame Building Image Energy Vanguard |
Have you been to the Lumber yard lately? The cost of lumber used to build homes and buildings is at an all-time high for my lifetime. Does it really matter what is inside your walls as long as it is meets or exceeds building codes for structural framing, energy efficiency, and holds up the roof of the home?
Construction Estimate Example for Lumber requirement comparing Post Frame Wall 24 feet Long to stick frame wall 24 feet long both of which are 8 feet tall using board feet calculations using actual Board Feet of Lumber.
Post Frame | Stick Frame |
true dimensional 4x6 posts @ 8 feet spacing = 4 = 68 board feet (site built posts would be even less) | 2x6 studs @ 24 in spacing= 14 qty = 77 board feet |
3-2x4 Runners = 31.5 Board Feet | 2x6 top and bottom plates= 38 board feet |
Total: 99.5 Board Feet | Total: 115 Board Feet |
Savings of 15.5 Board Feet | 15.5 more board feet |
x 4 walls = 62 Board Feet Saved (almost the total board feet needed for the posts in one wall) | Door/Window Framing is a push or equal needs on construction techniques for this comparison. |
Board Feet Calculator |
To sum this up: Less Lumber plus less manpower needed plus the speed of the build all add up to saving the future building owner money.
Upcoming MOhemp Energy Blog Post will compare the materials inside your wall and its energy efficiency R Values.